Preliminary infrastructure planning GridReady Site Planner Estimate the modular infrastructure required to deploy your AI compute project. Step 1 of 8 Tell us about the project Your role ?Property/land ownerSystem integratorHPC/GPU operatorOther Project type ?Existing-building retrofitData-center expansionNew deploymentNot sure Project location * ? Target operational date ? Project name Project phasingSingle-phase deploymentMultiple planned phasesUnknownProvide an estimated future capacity Ultimate planned site capacity (kW) Compute and cabinet requirements GridReady selects a standard cabinet layout from the Modular AI Platform Scaling Guide. Total initial IT load (kW) * ? What is the highest cabinet density your equipment can support? *25 kW per cabinet33 kW per cabinet50 kW per cabinet67 kW per cabinet100–200 kW per cabinetCustom densityGridReady will select a supported cabinet layout that keeps the planned average cabinet load at or below this limit. Cabinet quantities are fixed by the supported platform configurations. Maximum supported cabinet density (kW per cabinet) Workload or server platform Cooling requirements Estimated IT heat-capture distribution100% air cooled through RDHx + FDHx90% air / 10% direct-to-chip80% air / 20% direct-to-chip50% air / 50% direct-to-chip20% air / 80% direct-to-chipThis estimates where server heat is captured. Passive hydronic FDHx and dual-zone central CDU distribution are included. RDHx and DLC manifolds included. Available onsite heat-rejection capacity (kW) Existing facility-water systemUnknownNoneChilled waterCondenser waterOther Electrical environment Power available to this project (kW) ? Available service voltage ?120/208V277/480VOther / unknown Generator-backed operationUnknownGenerator included/plannedNo generator Module redundancy ?N — capacity modules onlyN+1 — distributed standby capacityTwo-path / 1+1 — fully duplicated architecture Expected load ramp per month (%)10% per month20% per month25% per month50% per month100% in month oneThe utility schedule shows cumulative demand by month until full initial-phase load. Site readiness Building typeIndustrial or warehouseExisting data centerCommercial buildingNew constructionOther Available indoor data-center space with 350 PSF floor capacity and at least 11 ft. clear height (sq. ft.)UnknownEnter available areaSufficient space available Available outdoor heat-rejection space, if required (sq. ft.)UnknownEnter available areaSufficient space available Floor constructionUnknownSlab on gradeElevated structural slabRaised access floorOther Preferred cabinet-row arrangement per Data Center ZoneFive-cabinet rows with hot/cold aislesOne continuous long cabinet rowEach Infrastructure Distribution Unit (IDU) supports five cabinets. A long row connects up to four IDUs end to end for twenty cabinets. Hot/cold-aisle layouts place one IDU in each row. Indoor-to-outdoor distance (ft.) Rigging and delivery access ?Not yet verifiedAvailableConstrained Water availabilityUnknownAvailable for evaporative cooling — high water usageLimited availability for adiabatic pre-cooling — low water usageAir-cooled only — no water usage Fiber availabilityUnknownAvailablePlannedNone Permitting status ?UnknownApprovedIn progressNot startedNo permits or approvals in place Site notes Ownership economics and TCO The standard report uses disclosed administrator assumptions. Platform assumptions cannot be changed by visitors. Faster-deployment value assumes $185/kW-month of colocation rent and $1,000,000/MW-month of gross HPC/GPU rental income. Revenue follows the same monthly ramp as electrical demand. Optional additional monthly project revenue ($) ? Customize conventional-build assumptions TCO period (years) Conventional CAPEX override per supported MW ($) ? Electricity rate ($/kWh) ? Average IT utilization (%) ? Conventional-build PUE ? Conventional site-development costs ($) Conventional operations staffing (FTE) ? Conventional deployment duration (months) Colocation rent ($/kW-month) Gross HPC/GPU rental income ($/MW-month) Your preliminary result Calculating your configuration… Submit your contact information to receive the detailed configuration, assumptions, schedule, and site-readiness findings. Send my detailed report Name * Company * Business email * Phone Preferred contact methodEmailPhoneEither I agree to receive this report and project-related follow-up. BackContinueGenerate detailed report
Preliminary infrastructure planning
Estimate the modular infrastructure required to deploy your AI compute project.
Step 1 of 8
GridReady selects a standard cabinet layout from the Modular AI Platform Scaling Guide.
The standard report uses disclosed administrator assumptions. Platform assumptions cannot be changed by visitors.
Faster-deployment value assumes $185/kW-month of colocation rent and $1,000,000/MW-month of gross HPC/GPU rental income. Revenue follows the same monthly ramp as electrical demand.
Submit your contact information to receive the detailed configuration, assumptions, schedule, and site-readiness findings.